In this article +
Key takeaways
- Homes on the 1A domestic tariff can get up to ₹78,000 from PM Surya Ghar, the central scheme.
- Tamil Nadu adds a ₹22,000 top-up, taking the total to ₹1,00,000 for 3 kW and above.
- The subsidy is paid into your bank account after the system is installed and the net meter is commissioned.
- You must install through a registered vendor. Energyman files the application for you.
Rooftop solar has never been cheaper for Tamil Nadu homes. With the central PM Surya Ghar: Muft Bijli Yojana and the state top-up now available together, a typical 3 kW system gets ₹1,00,000 back, which covers a large share of the installed cost.
But the process runs through a national portal, your electricity distributor and your bank, and a missed step can delay the payment by months. This guide walks through each stage the way we handle it for our customers.
Who qualifies
You are eligible if all four of these are true:
How much you get
The central subsidy is fixed per kW and capped at 3 kW. The state top-up is added on top.
| System size | PM Surya Ghar (Centre) | Total with TN top-up |
|---|---|---|
| 1 kW | ₹30,000 | Confirm with us |
| 2 kW | ₹60,000 | Confirm with us |
| 3 kW and above | ₹78,000 | ₹1,00,000 |
Going above 3 kW does not increase the subsidy, but it can still make sense if your monthly usage is high. Your engineer will size the system to your bill, not to the subsidy.

Step-by-step process
This is the order the application moves in. Steps marked We handle are done by Energyman on your behalf.
- Register on the national portalRegistration on pmsuryaghar.gov.in with your state, distributor, consumer number and mobile number.We handle
- Apply for rooftop solarThe application is submitted against your consumer number with the proposed system size.We handle
- Feasibility approvalTNPDCL checks your connection and approves the application.Distributor
- InstallationOur team installs the structure, panels and inverter, usually in one to two days on site.We handle
- Net meter and inspectionTNPDCL inspects the system and fits the net meter. A commissioning certificate is generated on the portal.Distributor
- Bank details and subsidy creditYour bank account and a cancelled cheque are submitted on the portal, and the subsidy is credited directly to you.You + us

Documents you need
- Latest electricity bill showing the consumer number
- Aadhaar of the person named on the connection
- Bank passbook or cancelled cheque for the subsidy credit
- A photo of the rooftop where the panels will go
How long it takes
Timelines depend mostly on the distributor’s approvals. In our experience, the stages that take the longest are feasibility approval and net-meter installation, which is why we follow up on both for every customer.
Frequently asked questions
Can I get the subsidy if I install more than 3 kW?+
Yes. The subsidy stays at the 3 kW amount, and the extra capacity is paid for in full.
Do I have to pay the full cost first?+
Yes. The subsidy is credited to your bank account after commissioning. Low-interest loans are available through banks for many homes; ask us during your consultation.
Can I choose any installer?+
No. The system must be installed by a vendor registered for the scheme in your state.
Does the system work during a power cut?+
An on-grid system switches off during a power cut for safety. For backup, choose a hybrid system with a battery.
- PM Surya Ghar: Muft Bijli Yojana, national portal: pmsuryaghar.gov.in
- Tamil Nadu rooftop solar top-up, announced in the Revised Budget Estimates 2026-27 (DT Next, Energetica India, August 2026)

Selvakumar founded Luminary Solar Systems in 2011 and Energyman in 2016. He is Managing Director of Energyman Power Technologies India Pvt Ltd and Secretary of the Tamilnadu Solar Business Association.


